professional factory for Mobile Crane Hire West Yorkshire - RC-105 Safe Load Indicator for Mobile Crane – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

As a result of ours specialty and service consciousness, our company has won a good reputation among customers all over the world for Mobile Crane Hire Yorkshire , Mobile Crane Vacancies , Mobile Crane Hire Barnsley , At present, company name has more than 4000 kinds of products and gained good reputation and big shares on market domestic and overseas.
professional factory for Mobile Crane Hire West Yorkshire - RC-105 Safe Load Indicator for Mobile Crane – Recen Detail:

Using different sensors, the Safe Load Indicator monitors various crane functions and provides the operator with a continuous reading of the crane’ s capacity. The readings continuously change as the crane moves through the motions needed to make the lift. The SLI provides the operator with information regarding the length and angle of the boom, working radius, rated load and the current actual load which is lifted by the crane.
If non permitted lifting load are approached, the Safe Load Indicator will warn the operator by sounding and lighting alarm, And output control signal to cut off the power.

Operation Voltage DC24V
Operation Temperature ﹣20℃~﹢60℃
Relative Humidity ﹤95%(25℃)
Working Pattern Continuous
Alarm Error  <5%
Power Consumption ﹤20W
Resolution 0.1t
Comprehensive Error <5%
Control Output Capacity DC24V/1A;
Standard GB12602-2009

RC-105 Safe Load Indicator for Mobile Crane04

Function
1. Multifunctional display unit (Full-touch high-resolution color screendisplay , and can switch multiple languages.)
2. Power supply unit (Using wide voltage switching power supply module, ithas Overload, over current protection and self-recovery.)
3. Central micro processor unit (Using industrial-grade enhancedmicro-processing chip, fast operation speed and high efficiency.)
4. Signal collection unit (Using high-precision AD conversion chip, analogchannel resolution: 16bit.)
5. Data storage unit (Use EEPROM memory, to store historical work recordsof the device to prevent data loss.)
6. Peripheral interface unit (Remote data transmission. 7 channels output
control,10 channels switches input, 6 channels analog input, 4 channels485 bus, 2 channels CAN bus,4 channels UART; 1 USB2.0; 1 SD card/ TFcard.)
7.Alarm and control unit.

 

 

RC-105 Safe Load Indicator for Mobile Crane04

 


Product detail pictures:

professional factory for Mobile Crane Hire West Yorkshire - RC-105 Safe Load Indicator for Mobile Crane – Recen detail pictures


Related Product Guide:

Sticking to the belief of "Creating products of high quality and making friends with people from all over the world", we always put the interest of customers in the first place for professional factory for Mobile Crane Hire West Yorkshire - RC-105 Safe Load Indicator for Mobile Crane – Recen , The product will supply to all over the world, such as: Roman, Madrid, Guatemala, What You Need Is What We Pursue.We are sure our products will bring you first class quality.And now sincerely hope to promote partner friendship with you from all over the world. Let's joint hands to cooperate with mutual benefits!
  • Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By Pearl Permewan from Mombasa - 2017.09.28 18:29
    The manufacturer gave us a big discount under the premise of ensuring the quality of products, thank you very much, we will select this company again.
    5 Stars By Penelope from Bangkok - 2017.12.02 14:11
    Write your message here and send it to us