OEM Factory for Crawler Crane Parts And Functions - RC-200 Safe Load Indicator for Crawler Crane – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our concentrate on is always to consolidate and enhance the excellent and service of present solutions, in the meantime regularly develop new products to meet distinctive customers' demands for Mobile Crane Hire Hemel Hempstead , Mobile Crane Operation , Mobile Crane Hire London , We also ensure that your choice is going to be crafted with the highest good quality and dependability. Be sure to feel free of charge to contact us for additional information.
OEM Factory for Crawler Crane Parts And Functions - RC-200 Safe Load Indicator for Crawler Crane – Recen Detail:

Profile

Operation Voltage DC24V
Operation Temperature ﹣20℃~﹢60℃
Relative Humidity ﹤95%(25℃)
Working Pattern Continuous
Alarm Error  <5%
Power Consumption ﹤20W
Resolution 0.1t
Comprehensive Error <5%
Control Output Capacity DC24V/1A;
Standard GB12602-2009

Recen

Function
1.The precision is high and the digital display is accurate. The advanced anti-jamming technology overcomes the influence of environmental humidity, strong electromagnetic interference, zero drift and so on, and is safe and stable.
2.The multi-channel sensor signal input interface can be configured.
3.The product adopts Chinese interface and operation hint function. It is easy to install and debug, and easy to operate
4.Power down storage function, stored data can be preserved for a long time
5.The password function prevents the non meter operator from misoperation.
6.The high strength cast aluminum housing has good integrity, good sealing performance, dust-proof, waterproof and moistureproof, and the protection level reaches IP65.
7.Alarm and control unit.

 RC-200 Safe Load Indicator for Crawler CraneRC-200 Safe Load Indicator for Crawler Crane

Working principle
Firstly input the load curve table of the crane into the memory through the programmer, and then set various working condition parameters through the function of the man-machine dialogue window of the panel, and the host can work. It collects the signal from the weight sensor, and after the signal is amplified, it is converted into a digital signal by the A/D converter, and sent to the microprocessor CPU for calculation; After the comparison process, the relevant data is displayed, and on the other hand, compared with the preset limit values of weight, amplitude, angle, etc. in the instrument, when it exceeds 90% of the rated weight, it is issued. Sound and light warning. When the rated weight exceeds 100%, an audible and visual alarm is issued. When the voltage exceeds 105%, the control signal is output, and the control circuit that the crane runs in the dangerous direction is automatically disconnected, but the safety direction is allowed to operate, thereby achieving the purpose of safety
protection.

 RC-200 Safe Load Indicator for Crawler Crane
 RC-200 Safe Load Indicator for Crawler Crane
 RC-200 Safe Load Indicator for Crawler Crane

Product detail pictures:

OEM Factory for Crawler Crane Parts And Functions - RC-200 Safe Load Indicator for Crawler Crane – Recen detail pictures


Related Product Guide:

We keep improving and perfecting our products and service. At the same time, we work actively to do research and development for OEM Factory for Crawler Crane Parts And Functions - RC-200 Safe Load Indicator for Crawler Crane – Recen , The product will supply to all over the world, such as: US, Cambodia, Turkmenistan, We hope we can establish long-term cooperation with all of the customers. And hope we can improve competitiveness and achieve the win-win situation together with the customers. We sincerely welcome the customers from all over the world to contact us for anything you need!
  • This supplier offers high quality but low price products, it is really a nice manufacturer and business partner.
    5 Stars By Susan from Luxembourg - 2017.11.12 12:31
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Anna from Detroit - 2017.01.28 19:59
    Write your message here and send it to us