How to make sure the safety operation of Tower crane

On April 9, 2022, a collapse accident occurred during the tower crane erection at a construction site, and the casualties are unknown.

Summarizing the causes of tower crane collapse all over the world, there are 3 major aspects:

1. Installation and disassembly of the tower crane;
2.The improper operation;
3.The quality issue of the tower crane. Safety Operation is everyone's responsibility, serious violation of regulations and overloading operations.

dfg (2)
dfg (3)

The key point of avoiding accident is prevention.

With Complete solution for tower crane: Safety device + Hook camera system + Ground monitoring system make tower crane construction work safer. Drivers and managers can evaluate the safety status of tower cranes in real time to avoid potential safety hazards.

dfg (4)

Tower crane Load moment indicator and anti-collision system can provide real-time monitoring of tower crane operation, check the operation safety indicators of the tower crane, including weight, load moment, trolley, height, sleiwng, wind speed, zoning, anti-collision with sound and light warning and alarm when approaching the set limit, can achieve the tower crane Automatic cut-off of dangerous operations: When dangerous situations such as overload occur, the tower crane safety system can automatically cut off dangerous behaviors, so that the tower crane will be in the direction of safe operation and prevents the risky operation.

dfg (6)

Tower crane hook camera system : The guidance system can display real-time video images around the hook to the tower crane driver with high-definition images, so that the driver can make correct operations and judgments quickly and accurately, and solve problems such as blind spots of vision, blurred vision at long distances of the tower crane driver on the construction site.  It can effectively avoid the occurrence of accidents, and is an indispensable tool to improve the construction efficiency of the construction site, reduce the safety accident rate and the labor cost, and promote the digital standard construction site.

Install the hook camera, battery, and wireless charging bracket on the tower crane trolley. The camera will automatically focus and track the hook, to show real-time operation image of the hook according to the rising and falling distance of the lifting height with wireless transmission of video to the tower crane driver. On the operation screen, the tower crane driver monitors the hoisting range without dead ends, reducing accidents caused by blind hoists.

dfg (5)

Ground monitoring system: Special for record and view the data of every crane with RC-A11-II on site computer. Real-time monitoring Tower crane layout, position and movement on site ground computer.

dfg (1)

The system supports wireless data browsing.Users only need to install the corresponding monitoring software on site management PC and connect the communication antenna to real -time monitor the status information of each tower crane, including the real -time height of the tower crane, working radius,load quality,slewing angle,on-site wind speed and anti-collision information. ln addition, manager can also modify and upload site and tower crane data through monitoring software.When the tower crane needs to forcibly cross obstacles or enter dangerous areas,he can remote authorize to see if this operation is allowed.

www.recenchina.com
Headquarter:  CHENGDU RECEN TECHNOLOGY CO.,LTD
Malaysia Branch: RECEN CONSTRUCTION MACHINERY EQUIPMENT SDN BHD
Add: Block 3 Paris International, 288 CHECHENG West Second Road, LongQuanYi District, Chengdu City, Sichuan Province, China
E-mail: jia@recenchina.com
Phone/Whatsapp/Wechat +8618200275223


Post time: Apr-15-2022