Fast delivery Mobile Crane Blocked Duties Only - RC-105 Safe Load Indicator for Mobile Crane – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With sophisticated technologies and facilities, strict top quality handle, reasonable value, exceptional support and close co-operation with clients, we are devoted to furnishing the ideal worth for our clients for Mobile Crane Hire South Wales , Mobile Crane Vs Overhead Crane , Mobile Crane Hire Tamworth , We welcome all of the purchasers and pals to contact us for mutual added benefits. Hope to do additional business enterprise along with you.
Fast delivery Mobile Crane Blocked Duties Only - RC-105 Safe Load Indicator for Mobile Crane – Recen Detail:

Using different sensors, the Safe Load Indicator monitors various crane functions and provides the operator with a continuous reading of the crane’ s capacity. The readings continuously change as the crane moves through the motions needed to make the lift. The SLI provides the operator with information regarding the length and angle of the boom, working radius, rated load and the current actual load which is lifted by the crane.
If non permitted lifting load are approached, the Safe Load Indicator will warn the operator by sounding and lighting alarm, And output control signal to cut off the power.

Operation Voltage DC24V
Operation Temperature ﹣20℃~﹢60℃
Relative Humidity ﹤95%(25℃)
Working Pattern Continuous
Alarm Error  <5%
Power Consumption ﹤20W
Resolution 0.1t
Comprehensive Error <5%
Control Output Capacity DC24V/1A;
Standard GB12602-2009

RC-105 Safe Load Indicator for Mobile Crane04

Function
1. Multifunctional display unit (Full-touch high-resolution color screendisplay , and can switch multiple languages.)
2. Power supply unit (Using wide voltage switching power supply module, ithas Overload, over current protection and self-recovery.)
3. Central micro processor unit (Using industrial-grade enhancedmicro-processing chip, fast operation speed and high efficiency.)
4. Signal collection unit (Using high-precision AD conversion chip, analogchannel resolution: 16bit.)
5. Data storage unit (Use EEPROM memory, to store historical work recordsof the device to prevent data loss.)
6. Peripheral interface unit (Remote data transmission. 7 channels output
control,10 channels switches input, 6 channels analog input, 4 channels485 bus, 2 channels CAN bus,4 channels UART; 1 USB2.0; 1 SD card/ TFcard.)
7.Alarm and control unit.

 

 

RC-105 Safe Load Indicator for Mobile Crane04

 


Product detail pictures:

Fast delivery Mobile Crane Blocked Duties Only - RC-105 Safe Load Indicator for Mobile Crane – Recen detail pictures


Related Product Guide:

Our well-equipped facilities and great excellent command throughout all stages of generation enables us to guarantee total customer fulfillment for Fast delivery Mobile Crane Blocked Duties Only - RC-105 Safe Load Indicator for Mobile Crane – Recen , The product will supply to all over the world, such as: Niger, Kazakhstan, luzern, Our company offers the full range from pre-sales to after-sales service, from product development to audit the use of maintenance, based on strong technical strength, superior product performance, reasonable prices and perfect service, we will continue to develop, to provide the high-quality products and services, and promote lasting cooperation with our customers, common development and create a better future.
  • In our cooperated wholesalers, this company has the best quality and reasonable price, they are our first choice.
    5 Stars By Grace from Tunisia - 2017.04.18 16:45
    Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
    5 Stars By Astrid from Accra - 2017.11.20 15:58
    Write your message here and send it to us