Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen Detail:
Profile
The system through the human-computer interaction interface and a variety of signal transducer, arm angle, height,working range, heavy weight and load information reflect to excavator operator, the work ability of the excavator in its design parameter range safety and efficient use/in realtime. When the excavator operation is closeto or beyond the scope of the security, the host will issue a sound and light alarm to remind the operator to stop illegal operations. If the operator is still illegal operation, the host will automatically lock the termination signal sent to dangerous operation direction of excavator arm.
Product Features
1.using the 4.3 inch TFT LCD with truecolor;
2.the hydraulic sensor adopts importedmovement with strong overload capacity;
3.using digital angle sensor;
4. using oil pressure of the poweralgorithm;
5. the main interface with a graphicaldisplay,sound and light alarm,automaticcontrol.
Parameter
working voltage | DC 9v-36V |
working temperature | -20°℃-+70°C; |
storage temperature | -20°℃-+70°C; |
system error | ≤±10%; |
display error | ≤±10%; |
relay contact capacity | AC220V 3A; |
protection grade | IP65(other level of protection required customized) |
Components
1.Angle sensor Angle sensor must fixed on the mounting plate, and the mounting plate welding on the excavator arm.
2.Pressure sensor Customers need to prepare a three-way connector for connecting our sensors, One sensor for each of the inlet and return pipes.
3.LMI monitor Come with a universal joint that can be used to secure the display to a 12- 18mm pole.
4.Interface definition dc-24v power (red:+24v ,blue: GND); buzzer; arm angle sensor; boom angle sensor; return pipes (OUT) pressure sensor; inlet pipes(IN) pressure sensor

Fault diagnosis
1. If the display does not display
Check the power supply line, Confirmation is 24v.
2. If no weight or anglesingle Check pressure sensor and line
3. If weight data Inaccurate Re-calibration NO-load data.
Product detail pictures:


Related Product Guide:
We keep on with our enterprise spirit of "Quality, Efficiency, Innovation and Integrity". We intention to create extra worth for our buyers with our prosperous resources, superior machinery, experienced workers and superb services for Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen , The product will supply to all over the world, such as: Venezuela, Kuwait, Cape Town, We also provide OEM service that caters to your specific needs and requirements. With a strong team of experienced engineers in hose design and development, we value every opportunity to provide best products for our customers.

The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
